Gas Repairs – Update

As promised latest information on the gas repairs:

Southern Gas Networks (SGN) have made a temporary repair on the broken gas main at Penge Lane. The readings are down and the area is safe for over the Christmas Period. SGN will be attending site twice a day over Christmas to ensure that gas readings are still at a suitable level. This means that there will be no noisy works over Christmas giving the local residents a break from the noise. The gas board will resume their works next week to make this a permanent repair. Works are expected to be completed towards the end of mid-January, leaving the last week of January to permanently reinstate Penge Lane. The gas works have been authorised up until Friday 29/01/2016 and we are optimistic that this will be the road closure will not exceed this date.
Ben Howard, Traffic Officer
Transport & Highways | Environmental & Community Services London Borough of Bromley
Tel: 020 8461 7507 | Mob: 07951 071 248 | Fax: 020 8313 4796 http://www.bromley.gov.uk/roadworks

Advertisements

About pengeandcatorcouncillors

This blog is maintained by Cllr Kathy Bance MBE, Cllr Peter Fookes and Cllr Kevin Brooks, the Labour Party councillors for Penge & Cator ward on Bromley Council.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s